Installation

Derek Stake

The Engineering Perspective: How to Stop Fatigue Failure During Vibrator Installation

By Derek Stake

After reading some of our very informative blogs about vibration applications on hoppers, you probably learned that vibrators don’t damage equipment, wrong installations do. Those blogs described how critical it is to size the vibrator for your hopper applications and the importance of using a stitch weld to adhere the vibrator mount to the hopper wall. Now, I would like to provide some engineering support discussing why stitch welding is essential and further insight into how vibration works to improve material flow inside a hopper.

Read More…
Share this blog post:
FacebooktwitterlinkedinmailFacebooktwitterlinkedinmail
Mike Stratis

Top 5 Things NOT To Do When Installing an Industrial Vibrator

By Mike Stratis

Did you know properly installing your industrial vibrator can: Ensure you get the full benefits of optimizing your material flow? Prevent unnecessary downtime and damage to your equipment? Allow you to get the most bang for your buck when it comes to your ROI?

That’s why we have multiple blogs outlining what TO do when installing your industrial vibrator. This includes my previous blog, “The Importance of Proper Installation of Industrial Vibrators” or “Vibrators Don’t Damage Equipment, Wrong Installations Do” by Craig Macklin. However, in the hopes of saving you from future headaches, we need to address a very important subject: The Top 5 Things NOT To Do When Installing an Industrial Vibrator.

Read More…
Share this blog post:
FacebooktwitterlinkedinmailFacebooktwitterlinkedinmail
Avatar

Automate the Hammer Swing by Following These 5 Steps

By Cleveland Vibrator Team

Our team is frequently asked about the proper installation of our Single Impact Air Knocker units. Since these units require two strokes of air for proper operation, the required components and installation process are slightly different than a more traditional pneumatic piston vibrator. Here, we will answer frequently asked questions and walk through the step-by-step installation process.

Step One

After properly sizing and selecting the units (which can easily be completed by utilizing our Vibrator Selection Guide!), it is time to install. First order of business, what are the components required for proper operation? There are a few items needed:

  1. The Single Impact Air Knocker (Complete with the Exhaust Port Protector and Grade 5 mounting hardware, provided with each unit)
  2. The Mounting Channel
  3. Hoses
  4. Valve
  5. Filter/Regulator/Lubricator
  6. Safety Cable
  7. Timer Box (Optional)

Read More…